As the architectural sub-consultant on the team, we were tasked with designing the new addition of the front vestibule, enclosed emergency stair, electrical yard enclosure, and covered walkway on the front the building as well as re-cladding the exterior in a new metal panel to distinguish the CDCC area from the existing facility. We designed the vestibule to be a secure entry for both staff and visitors and connect seamlessly in architectural style to the existing structure and new stair enclosure by using the same metal panel cladding on the exterior walls and the same store-front assembly on the vestibule and stair. This was a great project to work collaboratively with the rest of the team in a cloud based, BIM360 environment.