Archives

Cookie Box Creation

 
Girl Scouts build science skills in Cookie Box Creations contest
Northeast Texas Girl Scouts Put on Engineering Caps for Cookie Box Creations
Cookie Box Creations Are In Town!
Girl Scouts Cookie Construction
Girl Scout cookie construction challenges girls across metro Kansas City

Comments Off on Cookie Box Creation

January 2013 Newsletter

W

e are pleased to announce that Charyl F. McAfee-Duncan, McAfee3 Architects’ Dallas Principal, was recently elevated to the College of Fellows of the American Institute of Architects. This honor was bestowed on Charyl for her significant contributions to the profession of architecture and for her ever-increasing service to society.

Charyl McAfee-Duncan is a committed advocate of public art and the built environment through her development of creative and engaging programs that support women architects and introduce young girls to the profession of architecture.

Charyl McAfee-Duncan impacts society by being an involved voice for the profession, by her commitment to public-art programs, her contributions to the built environment in public spaces, and the innovation and development of successful programs that influence and uplift the lives of young girls and women architects. As a role model and proactive participant, she imparts in them an appreciation and understanding of the significance and contributions of architecture.

Comments Off on January 2013 Newsletter

DFW Airport

Terminal D Common Use Premier Clubs

Following the work performed on Terminal D, McAfee3 Architects as Assigned the Foreign Flag Carriers Airline Lounges under HKS’ contract. McAfee3 was commissioned to take 18,000 square feet of Terminal D, and turn it into five exclusive European styled clubs that would service 350 airline patrons. The work included space planning and design, interior finish-out, design of casework, and furniture selection. Each of the clubs, individually unique, serves a particular airline and contains a main lounge, a VIP Lounge, business centers, TV Lounge, restrooms, Children’s lounge, library, places to store luggage and kitchens. Also on the club floor, are private showers, conference rooms, a smoking lounge and exclusive artwork displayed throughout.

 

Terminal E – Automated People Mover (Skylink) Terminal Station

The terminal station renovation projects are part of DFW’s massive capital development campaign. The new automated people mover (APM) systems connects existing Terminals A, B, C, and E with International Terminal D. This elevated structure shuttles passengers to destinations anywhere in the airport in 30 minutes or less. Architectural services for the renovation included:

  • providing gateways to existing terminals at the north and south ends
  • relocating and replacing in-kind facilities and functions that the APM station displaced

Design work included concession spaces, spaces assigned to Delta Airlines, restrooms, Delta Airlines gate counters and adjacent seating layouts, DFW administrative offices, and signage.

Comments Off on DFW Airport

Hartsfield-Jackson Atlanta International Airport

McAfee3 plays a key role in the planning and design of several new projects at Hartsfield-Atlanta International Airport that are part of a $7 billion airport master plan, responsible for projects that include a major renovation of the existing Central Terminal Passenger Complex; a new International Terminal with thirteen new gates; the addition of a fifth new runway; and a Consolidated Car Rental Facility that will accommodate almost 9000 ready/return parking spaces. In addition, McAfee3 has led the effort to establish comprehensive airport design standards.

Maynard Holbrook Jackson International Terminal

Completed: 2012

McAfee3 was the Principal Architect and Lead Quality Assurance Consultant, under the DOA Assistant Director of Engineering, for the new $1.2 billion International Terminal at the Hartsfield-Jackson International Airport.

  • McAfee3 acted as on-site owner’s representatives for design, construction and quality assurance.
  • We also provided Design Management/Quality Assurance oversight of the design team to ensure program compliance to achieve design excellence through design workshops.
  • McAfee3 improved constructability of the documents using document reviews and comments.
  • As part of integrate construction administration team to ensure quality of construction by mitigating design deficiencies and on-site construction issues through daily interference with various stakeholders, Consulting Architects and Engineers and Department of Aviation project managers and support staff.

 

Consolidated Rental Car (CONRAC) Facility

Completed 2004

Project management and pre-design services for remote rental car facility that is connected to the main terminal by a 1/6 mile elevated guideway. The facility includes 2 four story parking decks; 2.8 million square feet of parking; more than 8,700 ready, return and storage parking spaces; 1,200 additional ground storage spaces; 10 rental car agencies; 137,000 square foot customer service center; 6 two car APM trains; 1 maintenance and recovery vehicle; 1.3 acre APM train maintenance facility; 27 acre maintenance, wash and fuel facilities; and fuel pumps and wash bays.

 

Comments Off on Hartsfield-Jackson Atlanta International Airport

Samuell-Grand Tennis Ctr.

Location: Dallas, TX
End Date: June 2012

Project Size: 2500sqft. / $750,000.00
Firm’s Role: Architect of Record

The City of Dallas Parks and Recreation Department is building a new pro-shop for the Samuell-Grand Tennis Center. This facility is approximately 2500 square feet and contains restrooms, office space, storage, retail space and areas for vending and small group discussion. The orientation of the building allows for day lighting opportunities to the northeast, and southwest. The interior circulation is centralized around the front desk.

 

The Northeast windows look out onto the neighboring courts and the Southwest windows look toward the parking lot, teaching court and entry to the tennis center. We created a garden entry and courtyard area with the remaining area of Court 14. The center is the equivalent of two courts or 13,200 sq.ft. The building itself is 2251 sq.ft.
Comments Off on Samuell-Grand Tennis Ctr.

Eastfield College

 

Location: Mesquite, TX
Completion Date: February 2005
Construction Cost: $6 million
Size/Scope: 22,000 SF
Services Delivered: Architecture, Interior Design
Project Type: Renovation & Addition
Firm’s Role: Architect of Record

McAfee3 has built a long-term relationship with the nation’s second-largest community college district. Accommodating 146,000 students, DCCCD is comprised of 10 campuses totaling 1,500 acres and four million SF of facilities. McAfee3 designed a 22,000 SF science building on the campus of Eastfield Community College in Mesquite. This new Science Building is comprised of chemistry and biology science labs, with anatomy and microbiology labs and a conference center for campus activities. After the science department moved into the new building, which McAfee3 designed, and then renovated 13,000 SF of existing labs in Building C. Redesign included a new geology physics lab, computer classrooms, and faculty offices for the math and science divisions.

Also a part of this project was the addition and renovation of locker rooms, weight room, classrooms, updated furniture, fixtures and equipment and a new single point of entry into the Physical Education building.

Comments Off on Eastfield College

DART Light Rail

Location: Dallas, TX

In December 2001, McAfee3 began surveying and is continuing to conducting field reviews of the existing DART Light Rail Stations, Transit Stations, and Bus Stations, which include the entire Red Line, Blue Line, Transit Centers, and the Trinity Railway Express. These field reviews will determine existing site conditions and produce the scope of services needed to conduct improvements, art restorations, and architectural elements as needed to each station. These studies will also point out the troubled areas and offer suggestions, as well as highlighting the more notable areas and the positive effects that they have as it pertains to DART and the community.
Comments Off on DART Light Rail

Metro Transit

Central Oklahoma Transportation & Parking Authority


Oklahoma City, OK
Construction Cost: $5 million
Size/Scope: 1.8 acres
Firm’s Role: Architect of Record
Services Delivered: Architecture
Project Type: New Construction

McAfee3 Architects was responsible for programming, designing, and managing the 5,500 SF building and 75,000 SF site. This facility simultaneously services 17 buses and several “express trollies”, thus maintaining constant citywide service. 1% of the construction cost went towards a Public Art Project.
Comments Off on Metro Transit

Rhema Word

Comments Off on Rhema Word

Morehouse College

Design Gateway Entrance & Renovation of Dean’s Office and Research Labs


Location: Atlanta, GA
Firm’s Role: Prime Architect Services
Delivered: Planning, Design
Project Type: Renovation, Restoration

McAfee3 Architects provides planning and design services for the School of Medicine including redesign of laboratory facilities and administrative offices. Additionally, McAfee3 Architects has created a gateway and streetscape into the campus complex. The gateway reflects the heritage of the institution and complements the existing campus structures. The streetscape project incorporates redesign of traffic flow and street beautification.

In addition, McAfee3 was tasked with renovating the Dean’s Office and two research laboratories.

Comments Off on Morehouse College